Any meetings shall be arranged in a reasonable time. Both parties must contribute to ongoing dialogue

The supplier must register sufficient master data in the EPD database for the product to be assigned an EPD number. This is phase 1 of master data registration, and must occur at the latest in U-15 (timeline A1).

Remaining relevant basic data information according to defined information width must be registered in the U-6 (timeline A3.1) after assortment verification).  This is phase 2 of master data registration.

Deadline for submission of a control measurement product at EPD Checkpoint / Tradesolution is Friday in U-3 (Timeline A8).

Reference is also made to the process description on www.tradesolution.no.